00II$t EECOIIYENED TN SPECIAL 9ESSI0N eg CofOber E7th, 1959, at 1Os00 o'clock.A.M. in, the Gept,~nQsstrt-thereof, with all officers present excepting Commiaei oner Powell, and the Court having duly opened, the following orders were pa seed. o-o-o-o.-o-o-o ORDER REQUESTING GROVER WILLIAM3 TO SUBMIT PLANS AND SPECIFICATI UNS FOR REPAIRING FLAT ROCK DAM On this the 27th day of October 1959, Dame on to be heard and ooneidered the matter of employing professional counsel and services for the repairing oP Flat Rock Dam. Motion duly made by Commissioner Brewton, seconded by Commissioner Bartel, and unanimously approved by the Court present, to retain the professional aervioes of Grover Williams, Regi stared Profeselonal Civil Engineer of the Trinity Testing Labo ratoriea, at a minimum Yee of seven and one-half (7i`~) peroent, and not to exoeed a maximum of eight and one-half (8y¢) peroent of the total construction oo et, to draw plane and speoifioatione for the neoessary repair of Rock Dam, based on Plan A. o-o-o-o-o-o-o N0. 8406 APPORTIONMENT OF ;2500.00 FROM ROAD d: BRIDGE This the 27th day of October 1959, after motion duly made by Commieeloner Stone, se- conded by Commissioner Braxton and unanimously approved, that the County Clerk and County Treasurer be, and are hereby directed to apportion the following amounts out of Road & Brid. Fund, to the following reepeotive Commissioners' Precinote, ae follows: ~ Road & bridge No. 1 $850.00 Road d Bridge No. 2 5450.00 Road & Bridge No. 3 5400.00 Road 3 Brldge No. 4 Y800.00 o-o-o-o-o-o-o COUNT ADJOURNED at 12:10 o'clock Noon Ootober 27th, 1959• o-o-o-o-o-o-o COURT RECONVENED IN SPECIAL SESSION on October 31 et 1959r at 10:00 o'clook A.M., in County Court thereof, with all officers present, and the Court having duly opened, the orders were pa~~ed. o-o-o-o-o-o-o 8407 ORDER TO REPAIR FLATRO CR DAM AND ISSUE WARRANTS On this the 31 et day od Oatobsr, 1959, name on to be hearth and considered by the Cou matter of repairing damage to Flatrook Dam heretofore constructed by Kerr County on Dam It appearing to the Court that unforeseen damages to the public property of Kerr Cou been sustained se s result of major flooding of the Guadalupe River; and, It further appearing ~o the Court that damages oaused to the Flood Control Struoture ed at Dam SiteD on the Guadalupe River are imperiling the entire etruoture as well se jacent publio and private property= and, It further appearing that the health of marry oltisene is being impaired by lose of mestio xater supplies dependent on the normal lmpoundment of water by said dam; and, It further appearing to the Court that immediate repair to said structure must be feoted to proteot it from irreparaple physical damage, to protect the publio health, and t oteat adjaoent pn~blio and privets property from the immediate threat of oataetrophio los event of further flooding of the Guadalupe River; and, It further-appears to the court that the oircumstanoee result in s publio oalamity an. o reates an imperative smorgenoy.