! ti~~ appointed to the Kerr County Veterans' Land Board to fill the vacancy. o-o-o-o-o-o-o-o-o-o IQO. 13166 APPROVAL OF PAYMENT TO I:ERRVILLE TELEPHONE COMPANY FOR UTILITY LINE RELOCATION OIQ HIGHWAY 16 SOUTH OF F. M. ROAD 689 On this the 18th day of November 1977, upon motion made by Commissioner Stone, seconded by Commissioner Lich, the Court unanimously approved payment to the Kerrville Telephone Company in the amount of $2930.96 for utility line relocation on Highway 16, South of F. M. Road 639, completed this date, and that a voucher be drawn on the Highway 16 Right-of-Way Fund, payable to the Kerrville Telephone Company, in the above amount. o-o-o-o-o-o-o-o-o-o COURT ADJOURNED NOVEMBER 18, 1977 at 11:15 o'clock A. M.. o-o-o-o-o-o-o-o-o-o CHANGE ORDER NUMBER: TWO (2) PROJECT: Kerr County Correction/Detention Facility (name, address) Kerrville, Texas TO: (Contractor) C. A. Logeman, Inc. P. O. Box 37385 4652 Monterey Street San Antonio, TX 78237 CHANGE ORDER NUMBER: TVdO (2) ARCHITECT'S PROJECT NO: 7408 A CONTRACT FOR: General Construction CONTRACT DATE: 10 March 1977 You .are directed to make the following changes in this Contract: 1. Strengthening Precast Concrete and Metal 49indow Walls by adding continuous hollow metal vertical members and reinforcing steel --- Add 2. Install moulded rubber stair treads and sheet rubber landings on Stair No. 2 from ground floor to second floor ------- Add 3. Provide additional access doors per our letter of 8/10/77 ---- Add 4. Adding vestibule at ground floor level of Stair No. 2; provid- ing emergency exit devices and electric locks for this vestibule door (G 10) and for existing door (G 07) ------- Add 5. Additional Electrical work as shown on Sheets E-2 & E-6 (Revised 8/24/77) for additions td CCTV and Intercom Systems -------- Add $7,168.00 939.00 198.90 3,575.00 4,110.00 (}., f~ ~ ~y;,. Total Additions $15,990.90 The original Contract Sum was $ 581,800.00 Net change by previous Change Orders $+ 75,006.00 ',The Contract Sum prior to this Change Order was $ 656,806.00 The Contract Sum will be (increased) by this Change Order $+ 15,990.00 The new Contract Sum i ncluding this Change Order will be $ 672,796.90 The Contract Time will be (increased) by (60) days 'The Date of Completion as of the date of this Change Order therefore is 13 March 1978 A. B. Swank FAIA & Lester B. ARCHITECT 4310 F Vdestside Drive Address Dallas, TX 75209 By /s/ Lester B. Whitton DATE iQov. 14, 1977 Whitton PE C. A. Logeman, Inc. CONTRACTOR P. O. Box 37385 Address San Antonio, TX 78237 By /S/ C. A. Logeman DATE Nov. 15, 1977 Filed 17th day of Nov. A.D. 1977 at 11:30 A. M. EMMIE M. MUENKER Clerk, County Court, Kerr County, Texas By /s/ Dorothy L. Pfeiffer Deputy Kerr County, Texas Oti+7NER c/o Judge Julius R. Neunhoffer Kerrville, TX 78028 ADDRE53 BY /s/ Julius R. Neunhoffer County Judge DATE Nov. 14, 1977 o-o-o-o-o-o-o-o-o-o