ORDER NO. 1668 AMENDED BIDS FOR CONSTRUCTION OF A JUVENILE DETENTION CENTER ON THE THTTIyyRDppuFLDDOIIO~~pRggOppF THE KERR COUNTY COURTHOUSE REFERRED TO COUAND RECOMMENDADTIONCHITECT WALKER FOR STUDY On this the 9th day of June 1986, upon motion made by Commissioner Higgins, seconded by Commissioner Lich, the Court unanimously approved that amended bids received for the construction of a Juvenile Detention Center on the third floor of the Kerr County Courthouse, Kerrville, Texas, be referred to the County Auditor and the Architect (Dlichael N. Walker) for study and recommendation. MEMORANDUM ARCHITECT T0: All Bidders RE: Alterations and Renovations MICHAEL Third Floor of Kerr County Courthouse Juvenile Detention Center N EAL Architect's Project No. 8622 WALKER FROM: Mike Walker DATE: June 5, 1986 The attached Addendum 2 documents the Savings which we discussed for the above referenced project. These Savings should be sufficient to bring the project into the Budget as we understand It to be. Please submit your Bid on the enclosed form, either making your new lump sum as the Base Bid Amount or using your original Base bid and listing the Proposed Savings under Item 5. This procedure is being undertaken in this manner per the instructions of Kerr County Attorney Gary Kersey. It would be most helpful to have the Bid complete by the Commissioner's Court meeting at 10:00 a.m. on N,onday, June 9. This way, the Commissioners will have all the information they need to make a decision on beginning the Work. Thank you for your cooperation in this effort. Enclosure cc: The Honorable Gordon Morriss Don Williamson, Kerr County Auditor Gary Kersey, Kerr County Attorney Simon Harris, Kerr County Juvenile Probation Officer i3o; VESPER LANE KERRVILLE, TEXAS 78oz8 (5iz) 895-ARCH June 5, 19f26 ADUI'•.NDUM N0. 2 '1'O BI RUING DOCUMEN'f5 FOR ALTERATIONS ANU P,ENOVATIONS 1'FIIRD FLOOR Y.ERR COUNTY COIJR'CNUUSR JUVEtJILE DEPENTIuN CEN'PPfi AT?cnl'rcc•r~s puo,rFCr No. H~a2 T'he follawiny changes, dr~le,tiuns, additions, alCnraLions and clarifications apply Lo the Projer-. t: Manual and Drawings (Bidding Documents) for the above referenced project. All bidders, subconLrac:tors, materials suppliers, and other interested parties shall familiarize Chemselves wiY,h 1:he enCire Addendum. Addendum items ~_tre listed by reference Lo Specification Section, Drawing Numher, etc., for convenience only; this does not relieve any party affected from applying Addendum instructions to all Sections of Che project Manual or the Drawings as required Lo submit: an accurate bid. Items in this Addendum form a pat-t of the Biddiny Documents and proposed Conl,rac;t: Documents and supersede the specific: provisions to which Lhey apply. UF.AWINGS pE'CAIL 1, SIIEET 1 a. In V1> room, remove only Lhe i;op hunJ< bed; Jower bunt: is to remain. b. Omit P'U (floor drain) in VEST' room. c. In T'LT, remove exisLiny she,lviug. d. lu MALE cell, delete all added floor platiny except, inside shower. e. In CNASE, remove bar:; from southwest wall. f. Delete Door tl. y. Concrete Masonry lJnits in EX (Exerci:;e) may be 6" Lhiclc in l ieu of fi". h. De lel.e sCer_1 plate chase for shower plumbiny; add f," reinforced CMIJ chase wall, with masonry andfor sCeel anchors t;o each wall., flooe-t:o-c:eiling. Allow maximum width iu Vestibule & minimum width chase consistent wil;h good plumbing practices. provide Inryco/Milcor fire rated ?.4 x 3F, a.crr.ss door, 16 ga. frame, 20 ga, door, self-locking cylinder' loci! w/masonry anchors, in lieu of that shown on Sheet 7., Uet:ail 7.. ADUENUUht N0. <^. JLIVF.NILE DET'EN'fI(lN CENTER pncE t 2. DEFINITIONS, SHEET t a. Provide 3 Ctotal) Bobriclc B-1556 l6"x20" polished stainless steel frameless mirrors with non-removable screws in lieu of single mirror shown on 5l2. Locate as directed by Architect. (SSTL MIR). b. CMU - Revise size shown to be 6" x 8" x 16" or size otherwise indicated. c. RXR - Relocating of x•adiators not in contract. d. XR - Existing radiator - Delete all radiator work from Contract. 3. DETAIL 1, SHEET 2 a. Delete Door 11 and 3/16" plate above. h. Add mir ror Cre: Item 2.a. ) top C 6'-6" AFF. c. Delete reference to steel plate Chase. d. Add 6" CMU chase wall re: Item l.h. e. Delete 5"x5" frg. angle. 4. DETAIL 2, SCIE:ET 2 a. Revise detail to have 6" CM[1 wall with access door re: Item 1.t~. b. Delete reference to SWR PART BEYDND c. Delete all reference to STL PL. 5. DETAIL 3, SHEET 2. a. Delete PIPE FRG reference. b. Delete reference to SWR FRG. c. Omit STL PL, except in SWR. cl. Add SSTL MIRROR top @ 6'-6". 6. DETAIL 9, SHEET 2: Delete 7. DETAIL I1, S}IEET 2: Delete 8. DETAIL 12, SHEET 1.: Re: 17/2 9. DETAIL 14, SHEET 2: Re: 17/2 10. DETAIL 15, SHEET 2: Delete 11. DETAIL 18, SKEET 2: Revise UUDR SCIIEUULE as follows: Door 2: Add 10x10 wire glass vision lite. Door. 3: Delete IiM door & frame details; reuse existing S'CL DR, Rework, adjust and lubricate existing lock, verify operation of door w/Architect. Door 9: Omit louver; undercut door 1/2" Door 6: Reuse existing door from 4 (in lieu of Door 2 ) Cut out 21"x36" opening in STL PL and replace w/section of SCR bars removed from chase. Door 9: Add: Use 1/8" PL to cover door leaving 12" air space at top & bottom of door; provide hinged 12"x1?," 1/8" STL PL view panel door similar to other existing SCR doors. Door l0:Add: Undercut door 1/2". Door 11:Delet:e ADDENDUM N0. 2 Jt1VENILE DETENTION CENTER PAGE 2 SHEET 3: Revise as indicated below, all other notes unchanged. ELECTRICAL NOTES 1 EXISTING FUSED PANELBOARD ON LOWER STAIR LANDING AND EXISTING PANEL IN BASEMENT FEED Tf1IS FLOOR - VERIFY. INTERCEPT CIRCUITS AT CLO5CEXISTING SHOWER) WITH NEW SURFACE-MOUNTED PANEL T}1US: 6 CIRCUIT MIN.; 1 50 AMP, 2 POLE; 4 20 AMP., i PULE <2 SPARES); 60 AMP LUG, MLO LOAD CENTER. VERIFY ALL FINDINGS WITH ARCHITECT BEFORE PROCEEDING. TOTAL FEEDER REPLACEMENT IS NOT REQUIRED, EXCEFT AS REQUIRED BY CODE. 2 DELETE THIS NOTE 3 THIS NOTE UOES NDT APPLY TO CIRCUIT TO F,XISTING LIGHTING FIXTURES IN VESTIRULE AND EXCERCISE ROOMS. 7 NOTE TO REMAIN AS IS; AUD TO T'!IE ENU: "AS REQUIRED". 12 REVISE TO READ; "EXISTING CONVENIENCE OUTLETS ARE NOT I2EQUIREU, MAY RE ABANDONED ANU REMOVED IF POWER IS REQUIRED ELSEWHERE." 15 DF.LF.TE DIALER FROM SMOKE ALARM SYSTEM, RX'fF:ND CONDUIT FROM SENSORS TO FACP NF,AR TELEPHONE OUTLET IN OFFICE: DIALER 1'i20VTDED BY 01'IIF,R^. GENERAL N01'ES ADD: F DO NOT EXTEND NEW PIPING OR CONDUIT TIIRU CELLS OR WITNIN REACIi OF INMATES IN CONFINED AREAS OF EITHER CELL W/OUT ARCIII TEC'I" S APPROVAL. PLUMQING NOTES UMIT NOTES 10,1(,1?., 13 - NOT IN CON'CRACT SPECIFICATIONS DIVISION 16, ITEM 20.3: Delete ADDENDUM NO. 2 JUVENILE DETENTION CENTER PAGE 3 ORDER N0. 16680 AMENDED BIDS FOR CONSTRUCTION OF A JUVENILE DETENTION CENTER ON THE THIRD FLOOR OF THE KERR COUNTY COURTHOUSE REFERRED TO COUNTY AUDITOR AND ARCHITECT WALKER FOR STUDY AND RECOMMENDATION 6-9-86 VOL. Q, Page 242