ORDER N0. 18617 MOTION TO AUTHORIZE COMMISSIONER HOLEKAMP TO WRITE LETTER TO TEXAS HIGHWAY DEPARTMENT INDICATING OUR CONTINUED EFFORT TO DEVELOP ALTERNATE ROUTE BETWEEN LANE VALLEY AND HERMAN SONS AND TERMINATING AT STAAKE RANCH On this the 20th day of April 1989, upon motion made by commissioner Ray, seconded by Commissioner Holekamp, the Court unanimously approved Commissioner Holekamp to write a letter to the Texas Highway Department indicating our continued effort to develope an alternate route between Lane Valley and Herman Sons, and terminating at Staake Ranch. '11 :J,,~ ., ~/. ~ /mot' •+!~ C~ COMMISSION ROBERT H. DEDMAN, CHAIRMAN JOHN R.BUTLER,JR. RAY STOKER, JR. STATE DEPARTMENT OF I~GHWAYS AND P~,1BL~C ~RAt~[$I'ORTATION Kerrvilrrle, Texas y78029-0951 April 13, 1989 ENGINEER-DIRECTOR R. E. STOTZER, JR Project: CRP 88(316)BROX Control.: 0915-15-006 Highway: CR 280 (Lane Valley Rd. @ Guadalupe River) County: Kerr Mr. Glenn Holekamp Kerr County Commissioner Precinct 3 Kerr County Courthouse Kerrville, Texas 78028 Dear Mr. Holekamp: This project was originally estimated at $505,000.00 Kerr County has sent the State a check for 10$ of this amount, which is $50,500.00. The following is the estimated cost breakdown for the entire project. The estimated total cost of the bridge and 150 ft. approaches that have Federal participation is $281,036.00. The total estimated cost of the 100$ County part is $55,644.00. The total estimated cost to Kerr County is: 100$ X $ 55,644.00 = $55,644.00 20$ X $281,036.00 = 556,208.00 Total $111,852.00 Less Previous Payment $50,500.00 IN REPLY REFER TO The County's remaining cost is approximately $61,352.00 Mr. Glenn Holekamp -2- April 13, 1989 Please send this office a letter advising the County is in agreement with their remaining obligation of approximately $61,352.00 and will pay upon request. It is also understood that this is only an extension of the already existing County/State ageement for this project. If the project goes under estimate, the County will be reimbursed the difference. If the estimate runs over, the County will have to pay the difference. If you have any questions feel free to contact this office. Sincerely, ' Bill M. Tucker, P.E. ~; Supv. Resident Engineer DJF:jb cc: Mr. John C. Kight, P.E. District Design Engineer ,~ Via, -. , ,'~,. ~J~ L COMMISSION STATE DEPARTMENT OF HIGHWAYS ROBERT H. DEDMAN, CHAIRMAN AND PUBLIC TRANSPORTATION JOHN R'. BUTLER, JR. P • ~ • BOX 9.~ 1 RAY STOKER, JR. KCCrVLIIe, TE?XdS 78029-0951 March 15, 1989 Project: CRP 88(314)BROX L'ontrol: 0915-15-005 Efighway: CR 272 County: Kerr Mr. Bill Ray Kerr County Commissioner Precinct 2 Kerr County Courthouse Kerrville, Texas 78028 Subject: Limits of Off-System Bridge Replacement Projects for 80$ Federal Par.ti.cipation Dear Mr. Ray: Ttiis letter is in reference to the "Construction and Maintenance Agreement For Bridge Replacement or Rehabilitation Off the State System for Elm Pass Rd. at Verde Creek between Kerr County and the State." ENGINEER-DIRECTOR R. E. STOT2ER, JR. IN REPLY REFER TO There have been questions raised by other counties concerning the limits of Federal Participation i.n the Off-System Program. The 80~ Federal, 20~ County participation is only for the costs of engineering, bridge construction acid approach road construction for 150 ft. at each end of the bridge. Any road construction past the 150 ft. is to be 100 County funded. This is what is considered "that portion of the cost of the project not reimbursable by the N'HWA." In the case where an existing bridge can be replaced in the original location, and the existing alignment (horizontal and vertical are adequate to present design standards) the 150 ft. approaches at 80~ Federal cost participation is usually sufficient for the job. IL1r . Bill Ray 2, March 15, 1989 If the bridge has to bE~ i.n r[ new location requiring longer approaches or the alignment (horizontal or vE~riical has to be elongated to meet design stand~~rds) then some por.ti.on of the project will require L00~ County participation. 1 hope this will clear any question;~. Sincerely, ~!~ = ~"`~ Bill M. Tucker, P.E. Supv. Resident Engineer DJF:jb c~~: John Kic~ht , P.F. District Design Engineer ~~~ } ti ~. 'ii ;~. COMMISSION STATE DEPARTMENT OF HIGHWAYS ENGINEER-DIRECTOR AND PUBLIC TRANSPORTATION R. E. STOTZER, JR. ROBERT H. DEDMAN, CHAIRMAN , JOHN R. BUTLER, JR. P • O • BOX 9 51 RAY STOKER, JR. Kerrville, Texas 78029-0951 March 14, 1989 IN REPLY REFER TO Project: CRP 88(314)BROX Control: 0915-15-005 Highway: CR 272 County: Kerr Mr. Bill Ray Kerr County Commissioner Precinct 2 Kerr County Courthouse Kerrville, Texas 78028 Subject: Utilities on Elm Pass Rd. at Verde Creek Bridge Dear Commissioner Ray: Underground utility locations are going to be in conflict with the new proposed reconstruction of Elm Pass Rd. at Verde Crk. Please inform Hill Country Telephone Cooperative of the apparent utility conflict and make the necessary adjustments. Otherwise this will slow the progress of the project because the project can't go to contract letting with unadjusted utilities. Your cooperation in this matter is appreciated. Sincerely, ~~ J~r8i11 M. Tuckez, P.E. L,/ Supv. Resident Engineer DJF:jb Attachments: Plan Sheet w/utilities ORDER N0. 18497 MOTION TO AUTHORIZE ROBERT REEVES TO DO APPRAISALS OF ELM PASS ROAD ON UP TO SIX (6) PARCELS AT $225.00 EACH, SHORT FORM, UP TO A MAXIMUM OF $1350.00 On this the 2nd day of March 1989, upon motion made by Commissioner Ray, seconded by Commissioner Baldwin, the Court unanimously approved to hire Robert Reeves to do appraisals of Elm Pass Road on up to six (5) parcels at $225.00 each, short form, up to a maximum of $1350.00.