dio 3d.i Item No. ~.4 Obtaining estimates Savings building. on renovations needed to Guadalupe Commissioner Morgan was asked to be the coordinator and advertise for bids on the Jobs needing to be done on the Guadalupe Savings building. We need to renovate the building with new rile to be placed un the roof. "Phe office space lri front needs to be painted, a new air ,_.onditioning unit is needed, ar,d we need to comply with the ADA PLAN. The County Engineer was asked to prepare a pruposa.i iux office space. Commissioner HoleY.amp stated that he was not sure whether or not we needed an architect or an enginee.~ for the job. Lue to the number of public using the building a need fur an architect would be advisable. al0 3~.~ Item Nu. ~..5 Consider Agreement with County Engineer to complete koad and Bridge Office. A motion was made to accept the memorandum tt,at Franklin r Johnston gave to the Court Gut was later withdrawn pending further discussion oI space allocation and bids that were already out tc. finish the interior of the road and bridge department building. Comrnissiunet Lackey, Commissioner Uehler, llavid Litke and Franklin Johnston were to have a meeting and discuss these things together ar,d come up with a solution to the problem. 'I'bis is to be addressed on "1'hur~day, August 1., lyy<. PAGE i~89