ORDER NO, 23680 AGF~ROVAL OF CHANGE ORDER FOR THE LQWER LE:VEL_ ANNEX OFFICES On this the 4th day of Navember^ 1996, upon motion made by Judge f2ober^t A. Denson, seconded by Commissioner Oehler, the Cour^t unanimously approved by a vote of 3-@-Q~, the Change Order far the Lower Level. Annex Offices in the ama~.~nt of 3770.00 as r^ec:ommended by the Rr^chitect and a~_ithorize the County Judge t:o sign same. CHANGE Distribution to ORDER OWNER ^ ARCHITECT ^ AIA DOCUMENT G707 CONTRACTOR ^ FIELD ^ OTHER ^ PROJECT: Kerr County Courthouse (name, addres~OWBr Level Annex Offices TO (Contrac~IOe--rrville, Texas 78028 W~i.C.H. Construction P.O. Box 1513 Fredericksburg, Texas 78624 CHANGE ORDER NUMBER: 2 INITIATION~~T~ber 21, 1996 ARCHITECT'S PROJECT NO: KCT CONTRACT FOR: General Construction J CONTRACT DATE~ugust 22, 1996 You are directed to make the following changes in this Contract: 1. Revise Electrical Plan E1 to add conduit and other prep- parations to facilitate the installation of fire and security system by others, including 2 pull stations and 4 audio- visual alarms. Re: Sheet E1 .2. Add 0 days Contract Time. $581.00 2. Add 4 electrical outlets and 4 conduits, boxes, and pull wire for Justice of Peace, Auditor, and Early Voting Spaces. Re: Sheet E1.2. Add 0 days Contract Time. 189.00 (Re: attached detail sheets from Contractor) Total this Change Order $ 770.00 lJot valid until signed by both the Owner and Architect. Signa[u re of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (Guaranteed Maximum Cost) was ........................... $ 58, 900.00 Net change by previously authorized Change Orders .......... ........................ $ 1, 715.00 , The (Contract Sum) (Guaranteed ~~laximum Cost) prior to this Change Order was .......... $ 60, 615.00 The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged) by this Change Order ......................................................... $ 7 7 0 . 0 0 The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be ... $ 61, 385.00 The Contract Time will be (increased) (decreased) (unchanged) by zero ( 0 )Days. The Date of Substantial Completion as of the date of this Change Order therefore is t' Authorized: -iyi-~ck~~l-~.r~ i r.,~ i~~.- W-i . CO, A e N ARCHITECT ~ Ad~1r303 Vesper P.OPd~t3x 1513 "~~~NF~AAater Street HiH ~a~wmorvi woi - i.ni~rv~~ v - - - THE AMERICAN INSTITUTE OF ARCHITECTS, 1715 NEW Yf~Rk :AVE. N.W., AV ASH LVGRJN, D.C. '_000C G7O7 - X978 From: William Hollatlay To: MICHAEL WALKER Date: 10/21!96 Time: 17:01:28 KRJLCO.XLS Page 1 of 1 ADD. ADD ELECTRICAL OUTLETS I 150 150 150 CHANGE ' 150 150 150 INSURANCE 3.19% '. ~ - - 5 BONDS 2.50°k - - 4 0.00°/a - - - ~ ~ TOTAL INSURANCE - g ____ SUBTOTAL COST - - - 150 150 159 LABOR ~5°k _ ____ ...... ____ _ ~... ___ MAT'L 8 EQUIP. 25% ---- - ~ ~ ---- ---- --- SUBCONTRACT 20% ---- ---- ~ ~' 30 ~ ---- 30 ---- TOTAL PROFIT ---- ---- ---- 3p ---- TOTAL ADD ELECTRICAL OUTLETS 1 gg Page 1 BID 1 From: Wuuam Fioiladay To: MICHAEL WALKER Date: 10~21i96 Time: 16:28:10 KRJLCO.XLS Page 2 of 2 ADD. ELECTRICAL (fl re alarm) _ 462 462 462 CHANGE 462 462 '~ 462 INSURANCE 3.19°k ~ ":. ~ ~ ~ - - 15 BONDS 2.50% ~ - - 12 ~ 0.00% ..... ',, - - - 0.00% - - - - TOTALINSU RANCE - 26 ---- SUBTOTAL COST - - - 462 462 488 LABOR .. 25% - ---- -- ,., ---',,,,.,. - -- MAT'L & EQUIP. 25% ---- - ~ --- ---- - ---- SUBCONTRACT 20% ---- --- ~ ~ ~ 92 ---- _ 92 - TOTAL PROFIT -- - '. --- ---- 92 ---- TOTAL ELECTRICAL (flre alarm } ~~ 581 Page 1 BID 1 Order No. 23680 Approval of Change Order for the Lower Level Anrex Offices Vol U pq 764