ORDER NO. .=37@5 RF'PROVAL OF AMENDED CHANGE ORDER FOR 7HE REMODEL OF THF_ LOWER RNNEX On this the 1'th day of November 1.996, ~_ipon motion made by Sudge Robert A, Denson, seconded by Commissioner Oehler, the Court unanimously approved by a vote of 5-@-@, the artiended change order subject to contractor si.gni.ng. CHANGE ORDER AIA DOCUMENT 6701 Distribution to OWNER ~ ARCHITECT CONTRACTOR ~( FIELD ^ OTHER ^ PROJECT: Kerr County Courthouse (name, addres~ower Level Annex Offices TOIContractlo-rPi-'~~rville, Texas 78028 I Wi.C.H. Construction P.O. Box 1513 Fredericksburg, Texas 78624 THIS '1NGE ORDER AMENDS, REVISES, REPLACES, AND VOIDS PREVIOUSLY ISSUED CANGE , ORDER N0. 3 CHANGE ORDER NUMBER: 3 INITIA~~"~.: 7, 1996 ARCHITECT'S PROJECT NO: KCT CONTRACT EOR: General Construction CONTRACTDATEAugust 22, 1996 You are directed to make the following changes in this Contract: 1. Add three foot section of shelving unit to match existing in Attorney's Storage Room; stain and seal with clear finish. Move light switch to be adjacent to existing door frame. $ 360.00 2. Delete re-installation of reception window and counter; provide in lieu thereof: a) 1 1-3 /8" solid core stain grade birch door sealed to match existing (no view panel with surface applied hinges, stop, and latchset hardware to match existing; b) install 2 of the removed secur- ity lighting fixtures in the County Attorney's Office, at locations as directed by Architect. Add 10 days Contract Time. 1,072.00 3. Provide 4 grab bars required by ADA and TAS: Bobrick con- cealed fastener, two #680ox36" back wall, two #36806x42" near side wall, mounted at 33-36" above finished floor. 331.00 (Window order time of 28 days is concurrent with 30-day Final Payment) Total Change Order (Re: attached Contractor's detail sheets)$ 1,763.00 Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum nr Contract Time. The original (Contract Sum) (Guaranteed Maximum Cost) was ........................... $ Net change by previously authorized Change Orders .......... ........................ $ The (Contract Su ml (Guaranteed Maximum Cosd prior to this Change Order was .......... $ The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) !decreased) (unchanged) by this Change Order ......................................................... $ The new (Contract Sum) (Guaranteed Maximum Costl including this Change Order will be ... $ The Contract Time will be (increased) (decreased) (unchanged) by ten The Date of Substantial Completion as of the date of this Change Order therefore is J V, J V V. V V 2,485.00 61,385.00 1,763.00 63,148.00 10 ) Days. Authorized: Michael Naal Wa~kpr Wi.C_H. C'onstrnr.tion Kerr County, Texas ARCHITECT CONTRACTOR OWNER Add e5per .OAdd 9X ss a er ree Kerrville, TX 7802 Fredericksbu TX 78624_~Eei vi11e, T: 78028 BY I L.... BY ~ BY DATE ~~ ` (-~'( (N DATE /lotC,OJ ~/~o DATE( ~ ~ Fy) 1'"4 L. AIA DOCUMENT 6701 CHANGE ORDFR APRIL 7978 EDITION ALA"" ~~~ 997H ~ ~ ~ THE AMERICAN INSTITUTE Or ARCHITECTS, X775 NSW YORK :AV E, N.W WASHIN(;TO N, D C °UaoG G]Ol -1978 Order Nc. 23705 Approval of Amended Change order fcr the Remodel cf the Lcwer Annex November 1?, 1996 Vol U pg 784