ORDER NO. ...',761 AP'P'ROVAL OF t:FiANOE ORDER FOR THE KERR COUNTY COURT"I-iOUSE RENOVRTION On this the 9th day of llecember 1996, upon motion made by Caminissianer Halekamp, seconded by J~_idge Robert A. Denson, the Cour-t. approved by a vote of 4-1-Q~, with Commissioner Lackey abstaining, the Change Order No. 1 for $9,985.00 for the Kerr Co~_tnty Caurthause Renavation and grant a six day extension on the contract. CHANGE Distribution to ORDER OWNER ^ ARCHITECT ^ AIA DOCUMENT G701 CONTRACTOR ^ FIELD ^ OTHER ^ PROTECT: Kerr County Courthouse (name, addres~irst Floor & Basement Kerrville, Texas 78028 TO (Contractor) Rhodes Commercial ConstructioN 1912 Junction Highway Kerrville, Texas 78028 CHANGE ORDER NUMBER: 1 INITIATION DATEpecember 5, 1996 ARCHITECT'S PROTECT NO: KCC CONTRACT~~eral Construction CONTRACTDATEpctober 2, 1996 You are directed to make the following changes in this Contract: 1. Per Drawing A3.2, Basement & Annex revisions: Remove section of wall for passage (Basement); Remove boiler concrete pad (Basement); Remove and replace existing concrete steps (Basement); Relocate water heater, power and lines (Basement); Relocate PVC drain line (Basement); Revise location of main disconnect panel (Basement); Relocate light fixtures (Basement); Provide new hollow metal doors and frames (Basement) Provide 1-hour drywall partitions (Basement & Annex) Cut opening in concrete, remove demolition (Basement & Annex) Provide steel support (Basement & Annex) Additional painting (Basement & Annex) Provide new concrete landing and steps (Annex) 1.A. Subtotal of Annex opening to Basement 2,406.00 1.B. Subtotal of Basement Work $ 6,224.00 2. Incorporate Phase 3 Work of extending outside air supply through Judge Able's Office 1,355.00 Total Change Order (Re: attached Contractor's detail sheets)$ 9,985.00 Nut valid until signed by both the Owner and Architect. Signa[u re n( the Co ntrach,r 'indicates his agreHment herewith, including any adjustment in the ConVact Sum or Contract Time. The original (Contract Sum) (Guaranteed Maximum Cost) was $ 215, $11.00 Net change by previously authorized Change Orders $ 0 . 00 The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was .......... $ 215, 811.00 . The (Contract Sum) (Guaranteed Maximum Costl will be (increased) (decreased) (unchanged) by this Change Order ......................................................... $ 9, 985.00 The new (Contract Suml (Guaranteed Maximum Cost) including this Change Order will he ... $ 225, 796.00 The Contract Time will be (increased) (decreased) (unchanged) by six ~ ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is Authorized: R err r.,,,,,r,. Te;~.~~ ARC C ~ AC OWNER ~~- 03 Vesper 19~11~~'st7unction Hwy. 710yd~~ter Street O~ AIA DOCUMENT G701 CHANGE ORDER APRII. 1976 EDITION NA'~ a 1976 ` t THE AMERIUN IN tiTITUTE OF ARCHITECTS, 17:35 NEW YORK AVE, N.NI. WASHINGTON, D C '_UOpG G701 -1978 RHODES COMMERCIAL CONa (RUCTION, L.L.C. 7912 Junction Hwy. 44 US 87 SouN Kerrville. TX 78028 Boerne, 7%78008 Tal (210) 895-4978 Tel. (210) 2494949 FAX (210) 895-1220 Tp; Michael Walker 1303 Vesper Lane Kemille, TX 78028 CHAD ~E ORDER Number ~O1 Phone 895-2724 Date 12/2/96 Job Name /Location Kerr County Courthouse Renovation Job Number Job Phone 6cisting Contract # Date of Contract , Furnish all labor, material and equipment to reroute HVAC duct from first floor up through Judge Ables office and out through roof. NOTE: This Change Order becomes part of and in conformance with the existing contrect. WE AGREE hereby to make the change(s) specified at this price: $ 1,355 00 Date 12/2/96 PREVIOUS CONTRACTAMT. $ 215,81 1 00 o tion Signature (Contrac r) ~/ REVISED CONTRACT TOTAL $ 217,166 00 G (~ . ~ /2,Q., v ACCEPTED -The above prices and specifications of this Change Order are satisfactory and are hereby accepted. All work to be performed under same terms and conditions as specified in original contract unless otherwise stipulated Date of Acceptance Signature (Owner) RHODES COMMERCIAL CONa r RUCTION, LL.C. 1912 Junction Hwy. 44 US 87 South Kerrville, TX 78028 Boerne,TX 78006 Tel (270) 895-4818 Tel. (210) 249-4949 FAX (210) 896-1220 TO: Kerr Co. Comm. Court c/o Mike Walker Kerrville, TX 78028 CHAD uE ORDER Number 0~2 Phone 895-2724 Date 12/2/96 Job Name/ Location Kerr County Courthouse Renovation Job Number Job Phone Existing Contract;i Date of Contract Furnish all labor, material and equipment necessary to complete work in accordance with revised basement drawing date 11/19/96. ITEMS O l) Remove section of wall for new passage 02) Remove boiler pad 03) Install concrete steps 04) Relocate water heater/lines 05) Relocate drain line 06) Relocate electrical 07) Install new fire rated partition 08) Relocate light fixtures 09) Install new hollow metal doors, frames and hardware 10) Install steel support above new door openings 11) Painting as required $9,729.00 NOTE: Deduct for not doing work in existing maintenance storage $3,505.00 NOTE: This Change Order becomes part of and in conformance with the existing contract. WEAGREE hereby to make the change(s) specified at this price: Date 12/2/96 PREVIOUS CONTRACTAMT. $ Aut zation Signature (Contrac r) ~ )~~ ~ REVISED CONTRACT TOTAL $ l y z~ V Nay ~Tucu R A ~ A dd r rtoNnr_ q fnouul a~ / r m c- . ~CO RfloRA7E TAB GxrsTc Ca.uZi?dcT ~wf /~1f'j7 /lot ACCEPTED -The above prices and specifications of this Date of Acceptance _ Change Order are satisfactory and are hereby accepted. All work to be performed under same terms and conditions as specified in original contract unless otherwise stipulated Signature (Owner) wt ~utrr 7a`~r- /o ~F loss~f3[ ~ Order NO. 23761 Approval cf change order for the Kerr County Courthouse ..°.enovation December 9, 1996 Vol. U pg 837