oRnER rao. ~a944 HPGRO6'NL OF CHHtdGE ORDER tJG. 6 FOR COURTHOUSE REriOGEL Or. this the 'bth day of Rpril 199., upon motion made by Commissioner Oehler, seconded by Commissioner P.aldwin, the Cap-irt unaniŽausly approved 6y a vote of 4-0-0, the change Order Na. 6 far 8C,93G.@0 from Line Item Na. ]~--401-571 Commissioners' Ca_~rt Contingency F~.~nd fcr Courthouse Remodel. CHANGE ORDER AIA DOCUMENT G701 Distribution to OWNER ^ ARCHITECT ^ CONTRACTOR ^ FIELD ^ OTHER ^ PROIECT: (name, address) TO (Contractor): Kerr County Courthouse First Floor & Basrment Kerrville, Texas 78028 Rhodes Commensal Constmction , LLC 1912 Jtmction Highway Kerrville, Texas 78028 __-._. I>kii~ICIAQYE unrk CnunN faurt Kerr foilgty, lr:XaS n iteEurf CHANGE ORDER NUMBER: 6 INITIATION DATE: Apri122, 1997 ARCHITECT'S PROJECT NO: KCC CONTRACT FOR: GeneralConstmction CONTRACT DATE: October 2, 1996 You are directed to make the following changes in this Contract: I. Replace lavatories designated as handicapped at Lower Level Annex Men's Room and one lavatory each in First Floor Courthouse Mm's and Women's Rooms with Kohler #2230, with accessible Citation fittings. Insulate hot water and drain PIP~g~ $ 1,727.00 2. Replace sttmp and pump for condensate lines &+om air handling units in Fast Basement Cmwl Space, including perma- nent elechical and drain linty into newly wmpleted 3" line. Re-support gravity drain lines in West Crawl Space. 1,851.00 Subtotal Contractor's 10% Overhead & Profit Total this Change Order $ 3,936.00 Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (Guaranteed Maximum Cost) was ........................... $ 215,811.00 Net change by previously authorized Change Orders ................................... $ 49,834.00 The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was .......... $ 265,645.1 The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged) 3,936.00 by this Change Order ......................................................... $ The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be ... $ 269,581.00 The Contract Time will be (increased) (decreased) (unchanged) by thirty-six ( 36 Days. The Date of Substantial Completion as of the date of [his Change Order therefore is May 6,1997 Authorized: ARCHITEQihChael Neal Walker CON"~tttllg~k-ommeroral COnst. LLI: OWNER `-- 1303 Vesper Addre~112 Jtmction Hwy. Address 710 Water Street AIA DOCUMENT 6701 CH:\NGE ORDER 4PRIL ta7R EDITION ~ 41 A'd ^~. 19713 ' THE AM ERIGIN INSTITUTE OF ARCHITECTS, 1735 NEW YORK ,\\'E.. N.W.. W,\tiH rN CTON D C. '_OOOG 6701 - 1978 qPF' 2c '97 Š2~2+7PM WNLkER GP.CHITECT p,g COMM(' iIONERS' COURT AGENDA R'~IIEST PLEASE FURNISH ONE ORIGI*iAL AN_D FIVE COPIES OF THIS REQUEST AND DOCUMENTS TO BE REVIEWED BY THE COURT. MADE BY: 11,~,i~~ ~ all~~.~ OFFICE: r' f r 6Yi ~ ~'1"~r rr--~i~ti 3~YŤv45 MEETING DATE: TIME PREFERRED: ~~%RM -23-1 EXECUTIVE SESSION REQUESTED: (PLEASE STATE REASON) ESTIMATED LENGTH OF PRESENTATION: IF PERSONNEL MATTER -NAME OF EMPLOYEE: NAME OF PERSON ADDRESSING THE COURT: i,.' ,til.i.la.i.~~~s Time for submitting this request for Court to assure that the matter is posted in accordance with Title 5, Chapter 551 and 552, Government Code, is as foIlows: Meeting scheduled for Mondays: THIS REQUEST RECEIVED BY: THIS REQUEST RECEIVED ON: a All Agebea Requests Wn'll be screened by the County Judge's Offiee to determine if adequate information has been prepared for the Court's fottaa! consideration and action at tithe of Court Meetings. Your cooperation will be appreciated and contribute towards you request being addressed at the earliest opportunity. See Agenda Request Rules Adopted by Contttussioners' Court. 5:00 P.M. precious Tuesday. SUBJECT: (PLEASE BE SPEC]FIC) _ Order N0. 23944 Approval of Chancre Order No.6 for Courthouse Remodel April 28, 1997 Vol, V page 126