nF?nER Ivo. ~::~av~t=a Ar-'r-'ROYAL. OF CHAhdGE CIRUER IWO. 1 FOR JHE DEMOLITION 4~'HASE OF= THE L'OURT(°IOUSi RENOVATION On this day the cEth day of June, 1~9E1 ~~~pon motion mae by Commissioner Let;, seconded by Commissioner Lackey, the Coi_irt unanimously approved by a vote of 4-~-Q~9 Change Order No. 1 for the Demotition G'hase of the Co~_u,thouse Renovation. CHANGE ORDER AIA DOCUMENT G701 Distribution to: OWNER ^ ARCHITECT ^ CONTRACTOR ^ FIELD ^ OTHER ^ PROJECT: Kea Connty Courthouse (name, address) 2nd Floor Annex Detention Demolition KetTVille, Texas 78028 TO (Contract r) : o ~ -- -• • I Mart, Inc. 1503 Petry Road, Irving, TX 75060 Mailing: P.O. Box 789, Cedar Park, TX 78630-078y CHANGE ORDER NUMBER: 1 INITIATION DATE:Jtme22, 1998 ARCHITECT'S PROJECT NO: KC2 CONTRACT FOR: General Demolition CONTRACT DATE: May 27, 199R You are directed to make the following changes in this Contract: 1. Revise provisions of Contract Documents (Demolition and Alterations Notes -General Notes - G4, and as otherwise noted) to allow daylight business hottrs demolition Work, iu lieu of the regttiremen[s that Work be wnducteri only after business hottrs, nights, and weekends, provided that problems of operation do not occur to which the Owner's persomlel raise objecKion. S (3,500.00) 2. Revise provisions of Comract Doclun~ts (Demolition and Alterations Notes - Sptx;itic Requirements - A6, :md as otherwise notes) io add demolition of existing exterior cast concrete liner panels in the cells to the Work of the Project. 6.00().()0 Subtotal 2,SOO.OU Contractor's 15% Overhead & Profit 375.) ) Total this Chang~er•Order S 2,875.00 "'lerl ~ Day of J t,t~ AD.1 ~TIMEg~j,~,.,` BiLLIE G. MEEKER Clerk County Court. Kerr County, Texas 9y. DePutY Not valid until signed by both the caner and Architect. Signature of the Contractor indicates his agreement herewith, mduding any adlustment in [he Contract Sum or Contract Time. The original (Contract Suml (Guaranteed Maximum Costl was ........................... 5 Net change by previously authorized Change Orders ................................... $ The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was .......... 3 The (Contract Suml (Guaranteed Maximum Costl will be (increased) (decreased) (unchanged) by this Change Order ......................................................... S The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be ... 5 The Contract Time will be (increased) (decreased) (unchanged) by none The Date of Substantial Completion as of the date of this Change Order therefore is Michael Neal Walker Mart, [nc. Authorized; ARCHITECT Address Kerrville, TX 78028 BY / p y DA rE lll~~~"-I.rN CONTRACTOR OWNER 1 sCl3~y ar arl Address Irving, TX 7506Q ~'dresz DA AIA DOCUMENT 6701 CHANGE ORDER APRIL t97A EDITION AIA® J 197A THE AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVE, N.W.. WASHINGTON. D C. _'OOOb 184,571.00 0.00 184,571.00 2,875.00 187,aa6.oi) D August 14, 19ygays. KeaCounty, Texas 700 Water Street Kerrville, T`X 7R(128 ~ Yc~ C7D1 - 1978 CHANGE ORDER A/A DOCUMENT G701 Distribution to OWNER ^ ARCHITECT ^ CONTRACTOR ^ FIELD ^ OTHER ^ PROTECT: KarCotrtrtyCottMouse CHANCE ORDER NUMBER: I (name. address) 2nd Floor Atmex Detention Demolition Kerrville, Texas 78028 INITIATION OATE:Itme22, 1998 TO (Contractor): ARCHITECT'S PROTECT NO: KC2 ,~ ~~ CONTRACT FOR: Gsuelal Demolition 1503 Petry Road, Irving, TX 75060 ~'~tailing: P.O. Box 789, Cedar Park TX 78630-078 Q CONTRACT GATE: 998 May 27, 1 You are directed to make the following changes in this Contract: I. Revise provisions of Contact Documents (Demolition and Ahaations Notes - Genaal Notes - G4, aad as otherwise rated) to allow daylight btsiness hoots demolition Work in lieu of the requirements that Wodc be crottdttctt:d only after business horns, nights, and weeke9ds, provided that problems of operation do not occur to which the Owner's persoffiel taiseobjection. S (3,500.00) 2. Revise provisions of Comact Documents (Demolition and Alterations Notes -Specific Requiremems - A6, and as otherwise noted) m add demolition of existing ecteior cast conaete Baer panels in the cells to the Work of the Project 6.000.00 Subtotal Connectors iSYa Overhead do Prom Total this Chance Order 2,500.00 375.~Q S 2,875.00 Not valid until signed by both the Owner and Architect. Signature of the Conmctor indiptes his agreement herewith, incuding airy adjustment in the Gontratt Sum or Contract Time. The original (Contract Sumt (Guaranteed Maximum Costl was ........................... $ 184,571.00 Net change by previously authorized Change Orders ........ .................. ~~~~~~~~~ $ 0'W The (Contract Suml (Guaranteed Maximum Costl prior [o this Change Order was .......... $ 184,571.00 , The (Contract Sum) (Guaranteed Maximum Costl will be (increased) (decrcasedl (unchanged) by this Change Order ......................................................... S 2 875 00 The new (Contract Suml (Cuannteed Maximum Costl including this Change Order will be ... S 187.446.00 The Contract Time will be (increased) (decreased) (unchanged) by nD°e ( 0 )Days. The Date of Substantial Completion as of the date of this Change Order therefore is August 14, 1998 • Mtt~ltae3 Neal WaOter Matt. I¢~ Authorized: KeaCottmy, Texas ARCHITECT CONTRACTOR OWNER- t3H3 Yey t5m a...., o,,,d 700 Water Street Address Kerrville, TX 78028 Address ~& ~ 75060 Address Kerrville, TX 78028 AIA DOCUMENT 6701 CHANGE ORDER APRIL 197a EDITION AIA~ 2 1978 THE AMERIGN INSTITUTE OE ARCHITECTS, 7775 NEW YORK AVE.. N.w.. WASHINGTON. O.C. ?OdIF aY aV Ca701-1976 Order No. 25406 Approval of change order no. 1 for the demolition phase of the courthouse renovation Vol V Page 691 June 26, 1998