ORDER N0. :?614c COURTHOUSE RENOVRTION CHRNGE ORDER #2 On this the 1?,th day of December 1999, upon motion made by Commissioner- Letz, seconded by Commissioner Griffin, the Court unanimously approved by a vote of 4-0-0, Change Order No. ~, Ker•r• Coi_inty Cour^tho~_ise and Rnnex Renovations - F'hase 3. COMMISSIONERS' COURT AGENDA REQUEST PLEASE FURNISH ONE ORIGINAL AND FIVE COPIES OF THIS REQUEST AND DOCUMENTS TO BE REVIEWED BY THE COURT. MADE BY: MIKE WALKER, ARCHITECT MEETING DATE: December 13. 1999 OFFICE: ARCHITECT FOR COUNTY PROJECTS SUBJECT: (PLEASE BE SPECIFIC) To consider Change Order #2. See attachment. TIME EXECUTIVE SESSION REQUESTED: (PLEASE STATE REASON) ESTIMATED LENGTH OF PRESENTATION: 10 minutes IF PERSONNEL MATTER -NAME OF EMPLOYEE: 11:30 A.M.+/- NAME OF PERSON ADDRESSING THE COURT: Mike Walker and Keith Longnecker, Owner's Representative, Keith Stoddard, Contractor. Time for submitting this request for Court to assure that the matter is posted in accordance with Title 5, Chapter 551 and 552, Government Code, is as follows: Meeting scheduled for Mondays: 5:00 P.M. previous Tuesday THIS REQUEST RECEIVED BY: THIS REQUEST RECEIVED ON: All Agenda Requests will be screened by the County Judge's Office to determine if adequate information has been prepared for the Court's formal consideration and action at time of Court Meetings. Your cooperation will be appreciated and contribute towards you request being addressed at the earliest opportunity. See Agenda Request Rules Adopted by Commissioners' Court. file:kccegend06 CHANGE ORDER AIA DOCUMENT G701 Distribution to OWNER ^ ARCHITECT ^ CONTRACTOR ^ FIELD ^ OTHER ^ PROJECT: Kerr County CourthousePhase3Renovations CHANGE ORDER NUMBER: 2 (name, address) 700 Main Street Kerrville, Texas 78028 INITIATION DATE: December 2, 1999 TO (Contractor): ~' ~ ARCHITECT'S PROJECT NO: KC3 CONTRACT FOR: Stoddard Construction Co., lnc. General Construction P.O. Box 33128 San Antonio, Texas 78265 I CONTRACT DATE: January 29, 1999 You are directed to make the following changes in this Contract: ]. Change Directive #5. (Refer to attached itemized breakdown sheet) $31,396.65 2. Change Directive #6. (Refer to attached itemized breakdown sheet) 270.34 3. Change Directive #7. (Refer to attached itemized breakdown sheet) 3,377.29 4. Change Directive #8 (partial). (Refer to attached itemized breakdown sheet) 19,725.22 5. Change Directive #9. (Refer to attached itemized breakdown sheet) 10,098.66 6. Miscellaneous items as outlined on attached itemized breakdown sheet 43 220.00 Total this Change Order including Contractor's Overhead & Profit $108,088.16 :Not valid until signed by both the Owner and Architect Signature of the Contractor indicates his agreement herewith, Including any adjustment in the Contract Sum or Contract Time. The original (Contract Sum) (Guaranteed Maximum Cost) was ........................... $ 2,367,500.00 Net change by previously authorized Change Orders ................................... $ 108,506.85 The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was .......... $ 2,476,006.85 The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged) by this Change Order ......................................................... $ 108,088.16 The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be ... $ 2,584,095.01 The Contract Time will be (increased) (decreased) (unchanged) by Ten (10 )Days. The Date of Substantial Completion as of the date of this Change Order therefore is April 13, 2000 Mir6aol Neal Walkrr Ctnddarri (`nnctmNinn Cmm~anv ARCHITECT CONTRACTOR T~ Address esper ane Ad a ox _ Kerrville, TX,7$028 San AO)onio, TX 78265 BY ~ Y~L ~1 U ! Y V+~ YIti- EY DATE ~~~.- C, -L ~ DATE l' AIA DOCUMENT 6701 CHANGE ORDER APRIL t97ft EDITION AIA'"~ ~~ 1Wri THE AMERIC.IN INSTITUTE OF ARCHITECTS, 1135 NEW YORK AVE., N.W., WASHINGTON, D. C. "![700! Authorized: Kerr County. Texas OWNER r\ddress _ /Kerrville, TX 7 028 l~^" ~ DnTE ~ 2~ 3 ~~ ~' G701 - 1978 December 2, 1999 Kerr County Courthouse & Annex Renovations -Phase 3 Breakdown by Directive for Change Order #2 Change Directive #5. by item: Total 1. In lieu of cutting an opening for Door 79 in the existing concrete panel as previously detailed, remove panel indicated. Provide 1 layer GB on 7/8" furring channels at CMU. At azeas of removed panels, patch the existing floor and ceiling to match existing. Refer to Drawing CL3.3. $ 2,568.70 3. North Bridge shall be detailed as shown on previously released Structural Drawings 20082, 70482, 706, 707, 708 dated 6-11-99, and Sheet M1.2 dated 5-5-99. 20,281.83 4. Sheet A7.1, Sheet E2.1: Revise reflected ceiling plan at Court 2 and locations of lighting fixtures as shown on Drawing CL17 and re-issued Sheet E2.2. Type C1 & C2 fixtures aze switched in two ways: three-way switch designated "CS" controlling one single lamp ballast in all fixtures, and switches designated "CN2" and "CS2" controlling two lamp ballast in fixtures divided into north and south groups, as shown on Sheet E2.2. Eight light fixtures shall be wired to nearest convenience outlet to funcfion as nightlight; refer to Sheet E2.2. (787.15) 5. Changes per issued CL Drawings, as follows: CL8: Add GB partition in Elec room to accommodate security plumbing piping. Relocate Door 49. CL12: Relocate wall at drinking fountain to accommodate existing plumbing pipe penetration. CL13: Reco~gure F Hold cell to accommodate security plumbing piping. CL15: Revise chase wall at Men2/Women 2 to accommodate plumbing piping. CL16: Revise chase wall at Tlt 1{Judge 1 to accommodate plumbing piping. 1,422.52 b. Concrete beams at east side shall be modified as shown on Eng. Wunderlich's drawing dated 7-19-99, to accommodate piping penetrations and addition of handicapped ramp at east side Ex Lobby. 7.910.75 Total Directive #5 $31,396.65 Change Directive #6. by item: 1. Ramp at east side Maintenance Entrance and Handicapped Ramp at east side Lower Level outside Ex Lobby are hereby revised per attached List of Structural Revisions (7- 27- 99): Sheet SRI8, SR19, SR20, $R21, SR22, and Architectural CL18 (7-27-99). $ 564.34 3. Due to specified R-13 insulation not currently being available, Contractor proposes to substitute R-11 insulation. Provide Architect with cost savings. 94.00 Total - Directive #6 $ 270.34 Change Directive #7. by item Total 1. Sheet E1.2: Additional conduit consisting of 3/4" conduit shall be required for communication and security devices at the following locations: Judge's Benches 1 & 2, Bailiff 1(south wall) & 2(northeast comer), C Coord(northeast comer), Sec(southeast comer) and Dist Clerk(7' AFF on west wall, east of Door X01 - 1" conduit). Head-End Panel shall be on the east wall north end, approximately 4' AFF; it may require 1" conduit from chase if not accessible. Sound system j-boxes shall be provided at Bench 1 & Bench 2. Judge's Bench 2 wall is closed and will require flex conduit be fished down through stud space; if not possible expose wire-mold in Vest 3. Refer to Drawings CL19 & CL20. $ 3,297.45 2. Reinforcing laps at Beam 1Q 11, & 12 shall be as shown by Contractor's sketch of 8-9-99, with the addition of one #9x20'-0" over support at horizontal offset between Beam 10 & 11, and by cutting off one #9 rebaz at offset. One #9x20'-0" and two #9x27-5" shall also be added at top over support between Beam 11 & 12. 79.84 Total - Dtrective #7 $ 3,377.29 Chance Directive #8 (partial). by item: Total 2. Provide a galvalume sheet metal expansion joint at entire perimeter of Annex roof at base flashing of parapet wall. $12,548.49 4. Per Kerrville Telephone Co., a 17"x30"x26" ground box shall be added neaz existing telephone pole at North Bridge, and a 24"x36"x12" junction box shall be added to existing telephone junction box located at Lower Level. Refer to drawing CL22 & CL23, and CDR Systems information sheets. Conduit servicing two existing street lights shall be routed underground north of retaining wall and does not require new junction boxes. 7.176.73 Total - Directive #8 (nartiall $19,725.22 Change Directive #9: Total 1. Sheet A4.1: The following information is provided to clarify various items on the Door Schedule. "Security" shall mean same as "detention" as intended in original Contract Documents. Door 16: Provide new 12 gauge security door and frame, with Folger Adam type detention lock to match existing. Door 21: Reuse existing security door, frame, and hazdwaze from existing south end bridge. Door 22: Hollow metal door and frame as scheduled; provide shrouded keypad and magnet lock, with sepazate keyswitch override control. Door 33: Hollow metal door and frame as scheduled; provide heavy duty cylinder deadbolt lock with push/pulls. Door 35: Provide new 12 gauge security door and frame, with Folger Adam type detention lock to match existing. Door 36: Hollow metal door and frame as scheduled; provide hazdwaze as submitted by Wesley-Thompson on 4-19-99. Doors 62, 63: Hollow metal door and frame as scheduled; provide shrouded keypad and magnet lock, with sepazate keyswitch override control. Provide closer and kick plates. Doors X14, X15: Existing door, frame, and hazdwaze to be refurbished. Doors X18, X19: Existing door, frame, and hardware to be refurbished. Doors ]6, 21, 35,X14, X15, X18, and X19 shall be keyed alike. Doors 21, 35, X14, X15, and X18 shall be tied in to fire alarm system with one minute delay release. 10.098.66 Total -Directive #9 $10,098.66 Miscellaneous items: Tot ]. Credit for revision to Lower Level north condenser pad per Drawing CL25. $ (164.00) 2. Provide a cast stone cap at North Bridge railing in lieu of Alternate #3 plastered polymer cap. 3,927.00 3. Provide a cast stone parapet cap in lieu of Alternate #3 plastered polymer cap. 39.457.00 Total: $43,220.00