COMMISSIONERS' COURT AGENDA REQUEST PLEASE FURNISH ONE ORGINAL AND NINE COPIES OF THIS REQUEST AND DOCUMENTS TO BE REVIEWED BY THE COURT. MADE BY: Franklin Johnston P.E. OFFICE: Road & Bridge MEETING DATE: July 8, 2002 TIME PREFERRED: SUBJECT: (PLEASE BE SPECIFIC) Consider and discuss obstruction to County Bridge EXECUTIVE SESSION REQUESTED: (PLEASE STATE REASON) NAME OF PERSON ADDRESSING THE COURT: Franklin Johnston P.E. ESTIMATED LENGTH OF PRESENTATION: 10 minutes IF PERSONNEL MATTER -NAME OF EMPLOYEE: Time for submitting this request for Court to assure that the matter is posted in accordance with Title 5, Chapter 551 and 552, government Code, is a follows: Meeting scheduled for Mondays: 5:00 P.M. previous Tuesday THIS REQUEST RECEIVED BY: THIS REQUEST RECEIVED ON: All Agenda Requests will be screened by the County Judge's Office to determine if adequate information has been prepared for the Court's formal consideration and action at time of Court Meetings. Your cooperation will be appreciated and contribute towazds your request being addressed at the eazliest opportunity. See Agenda Request Rule Adopted by Commissioners' Court. Franklin Johnston, P.E. County Engineer Kerr County Road & Bridge 4010 San Antonio Hwy Kerrville, Texas 78028 Telephone: 830.257-2993 Leonard Odom, Jr. Koad Administrator Truby Hardin, Coordinator tva Gass, Secretary FAX: 830-896-8481 Email: kcruads a(~tc.com TO: COMMISSIONERS COURT COUNTY ATTORNEY .,~ FROM: FRANKLIN JOHNSTON, P.E., COUNTY ENGINEER !C~i DATE: June 27, 2002 '~j t / RE: SEAGO BRIDGE The County has maintained Seago since August 8, 1995, and since that time the bridge has been "stopped up" with metal sheets, lumber, rocks, sack Crete, etc. County maintenance crews have cleaned it out several times but it always seems to come back. We have found that Heart of the Hills Camp is using this bridge for a dam to raise the level of the river. We have a problem with this practice for several reasons: It is the Road & Bridge Department duty to maintain the county infrastructure and adjacent landowners may not place obstructions in county right of way. 2. Using the bridge as a dam impounds water on property not owned by the people who place the obstruction at the bridge. 3. Liability - If this practice results in damage to the bridge, is the camp liable to pay for repairs or replacement? It is my recommendation that Kerr County should not give individuals permission to obstruct Kerr County bridges for their convenience. TNRCC has been notified and they made an inspection. A permit is required to impound water on the river. ~~~~ E/O Z ¢,. r.. +a. ~.,~,7 , _ _ .,_ w~ . ~ -:~, ~. 1,,, ON FRIDAY EVENING ON SUNE 7, 2002, KERR COUNTY ROAD AND BRIDGE FOREMAN FOR THE WEST AREA AARON WHEELER ARRIVED AT APPROXIMATELY 3:00 P.M. AT SEAGO ROAD CROSSING TO CHECK TO SEE IF THE BOX CULVERT WAS STOPPED UP. UPON ARRIVAL, HE OBSERVED THREE (3) MEXICAN MALES PLACING BAGS OF READY MIX CONCRETE, QUICKRETE, IN THE WATER ON THE WEST SIDE OF THE BOX CULVERT, LOCATED AT SEAGO ROAD CROSSING ON THE SOUTH FORK OF THE GUADALUPE RIVER, AARON WHEELER IMMEDIATELY NOTIFIED KERR COUNTY ROAD AND BRIDGE OFFICE IN KERRVILLE BY RADIO TO ADVISE OF THE SITUATION. TRUBY HARDIN AT KERR COUNTY ROAD AND BRIDGE OFFICE ADVISED AARON WHEELER TO GET A CAMERA AND GET PICTURES OF THIS SITUATION. AT APPROXIMATELY 3:30 P,M., AARON WHEELER ARRIVED AT THE INGRAM YARD OF KERR COUNTY ROAD AND BRIDGE DEPARTMENT TO PICK UP THE REST OF HIS WEST CREW. THESE CREW MEMBERS ARE RAY LYNCH AND EDWARD MARTIN. RAY LYNCH USED HIS PERSONAL 35 MM CAMERA. AARON WHEELER, RAY LYNCH AND EDWARD MARTIN ARRIVED BACK AT SEAGO ROAD CROSSING AT APPROXIMATELY 4:00 P.M.. UPON ARRIVAL AT SEAGO ROAD CROSSING, THERE WERE NO PEOPLE AT THE CROSSING. IT WAS OBSERVED THAT BAGS OF QUZCKRETE AND ROCKS HAD BEEN PUT IN THE OPENING OF THE BOX CULVERT ON THE WEST SIDE OF SEAGO ROAD CROSSING. RAY LYNCH TOOK 21 PICTURES OF THZS SCENE, WHICH ARE INCLUDED WITH THIS REPORT. THE WEST CREW OF AARON WHEELER, RAY LYNCH AND EDWARD MARTIN LEFT THIS SCENE AT APPROXIMATELY 4:20 P.M.. THIS REPORT IS WRITTEN TO THE BEST OF MY RECOLLECTION, SIGNED, ~-~ j/~ AARON WHEELER, FOREMAN KERR COUNTY ROAD AND BRIDGE DEPARTMENT, WEST CREW SUPPLEMENTARY REPORT - SEAGO ROAD CROSSING BOX CULVERT STOPPED UP ON THE EVENING OF JUNE 8, 2002 AT APPROXIMATELY 2:32 P.M., RAY LYNCH ARRIVED AT SEAGO ROAD CROSSING TO CHECK THE STOPPED UP BOX CULVERT, PER KERR COUNTY ROAD AND BRIDGE DEPARTMENT FOREMAN FOR THE WEST END, AARON WHEELER. UPON ARRIVAL, LYNCH OBSERVED THAT THE BOX CULVERT WAS NOT OBSTRUCTED AND THAT ALL ROCKS AND BAGS OF QUICKRETE HAD BEEN REMOVED ENTIRELY FROM THE SCENE. THIS REPORT IS IN REFERENCE TO JUNE 7, 2002, WHEN THE BOX CULVERT WAS OBSTRUCTED. RAY LYNCH LEFT THE SCENE AT APPROXIMATELY 2:37 P.M. S I//G/NE~~/D , o~ ~ G' ~ O - RAY LYNCH, WEST CREW MEMBER KERR COUNTY ROAD AND BRIDGE DEPARTMENT PHOTO I.D. SHEET JUNE 7, 20D2 3:00 P.M. BOX CULVERT INTENTIONALLY SEAGO ROAD CROSSING STOPPED UP AGAIN HUNT, TEXAS 1.) SEAGO ROAD CROSSING, WEST SIDE OF CROSSING, SOUTH SIDE OF GUADALUPE RIVER. 2.) IN REFERENCE TO PHOTO # 1. 3.) IN REFERENCE TO PHOTO'S # 1 AND # 2, NOTE ROCKS AND SACKS OF QUICKRETE THAT HAS BEEN STACKED IN OPENING. 4.) WEST SIDE OF CROSSING, OPENING OF CULVERT, SACK OF QUICKRETE. 5.) NORTH SIDE OF BOX CULVERT, WEST SIDE OF CROSSING, SACKS OF QUICKRETE DELIBERATELY PUT IN OPENING OF CULVERT. 6.) NORTH SIDE OF CULVERT, WEST SIDE OF CROSSING, IN REFERENCE TO PHOTO # 5. 7,) NORTH SIDE OF CULVERT, WEST SIDE OF CROSSING, SACKS OF QUICKRETE AND ROCKS DELIBERATELY PUT IN OPENING OF CULVERT. 8.) IN REFERENCE TO PHOTO # 7. 9.) WEST SIDE OF CROSSING, NORTH END OF CULVERT, SACKS OF QUICKRETE. 10.) IN REFERENCE TO PHOTO # 9, MORE SACKS OF QUICKRETE. 11.) IN REFERENCE TO PHOTO'S # 9 AND # 10, SACKS OF QUICKRETE AND ROCKS. 12.) WEST SIDE OF CROSSING, TOWARDS SOUTH SIDE OF CULVERT, MORE ROCKS AND QUICKRETE IN OPENING. 13.) IN REFERENCE TO PHOTO # 12, ROCKS IN OPENING. 14.1 WEST SIDE OF CROSSING, SOUTH SIDE OF CULVERT, ROCKS PLACED IN OPENING. 15.) WEST SIDE OF CROSSING, SOUTH SIDE OF CULVERT, SHOT FROM SOUTHWEST DIRECTION. 16.) IN REFERENCE TO PHOTO # 15. 17.) SEAGO ROAD CROSSING OVER GUADALUPE RIVER, NORTH SIDE. 18.) IN REFERENCE TO PHOTO # 17, VIEW OF OPENING ALSO. 19.) VIEW OF SEAGO ROAD, LEAVING S.H. 39, CROSSING TO THE LEFT. 20.) STREET SIGN, SEAGO ROAD, WHERE INCIDENT TOOK PLACE. 21.) ADDITIONAL PHOTO, SEAGO ROAD, STREET SIGN, END OF ROLL OF FILM WEST SIDE OF CROSSING, SACKS CULVERT. y,- SOX CULVERT~PUT IN OPENING OF ,~ - rt_ TH SIDE OF ~- 5 .) NOR ~'='~- OE QUICKRETE DELI/6E~RAT~E~LY Si_,~ ~1~7%~ i . ~ J 6 rv.V ..... ~ ~AI3l.. -:eilor~~ r. ~. 3.$1 •~` # ~.A 4 f^ s. ~'2y.'CIti' ,/.. 4 ~'i ` ~^ - _. ., ` ~:: ., w~ i ~ .1~ J ~ ~.~ FT'F;NCYT CROSSING, IN RFF",~ S CDT; OF. CULVERT, WEST SIDE OF E, . 1 NORTH 5 ..~ 'PO pyuTO ~ - _ z~= ^ ON THE MORNING OF NOVEMBER 8, 2001, AT APPROXIMATELY 7:30 A.M., THE KERR COUNTY ROAD AND BRIDGE DEPARTMENT WEST CREW RECEIVED A COMPLAINT FROM THE ROAD AND BRIDGE OFFICE THAT WATER WAS RUNNING OVER THE BRIDGE AT SEAGO ROAD CROSSING, WEST OF HUNT, TEXAS. AT APPROXIMATELY 2:30 P.M. ON NOVEMBER 8, 2001, THE WEST CREW ARRIVED AT SEAGO ROAD CROSSING TO INVESTIGATE THE COMPLAINT, AND OBSERVED WATER RUNNING OVER THE BRIDGE. IT WAS ALSO OBSERVED THAT THERE WAS A SHEET OF TIN OVER THE MOUTH OF THE BOX CULVERT, WEST SIDE. UPON REMOVING THE SHEET OF TIN, IT WAS ALSO OBSERVED THAT THERE WERE ROCKS STACKED UP INSIDE THE BOX CULVERT. THE WEST CREW THEN LEFT SEAGO ROAD CROSSING AND RETURNED TO INGRAM ROAD AND BRIDGE YARD. AARON WHEELER, FOREMAN OF THE WEST CREW, NOTIFIED LEONARD ODOM, JR., KERR COUNTY ROAD AND BRIDGE ADMIN- ISTRATOR, BY TELEPHONE AT APPROXIMATELY 3:10 P.M. ON THE MORNING OF NOVEMBER 9, 2001, AT APPROXIMATELY 9:00 A.M., THE WEST CREW ARRIVED BACK AT SEAGO ROAD CROSSING WITH A BACKHOE AND LONG PIPE TO PUNCH ROCKS OUT OF THE BOX CULVERT. PUNCHING BEGAN ON THE EAST SIDE (DOWNSTREAM SIDE) OF THE CROSSING. THEN THE BACKHOE MOVED TO THE WEST SIDE TO BEGIN MOVING ROCKS THAT HAD BEEN PUNCHED OUT. AFTER THE ROCKS WERE REMOVED FROM THE WEST SIDE, THE BACKHOE AND PIPE WERE USED TO PUNCH ANY OTHER ROCKS STILL LEFT IN BOX CULVERT, OUT AND DOWN- STREAM. BACKHOE IS STILL ON THE WEST SIDE. WHILE BACKHOE WAS ^ PUNCHING FROM THE WEST SIDE, IT ALSO PULLED LOOSE A 2" X 10" X 12 FOOT BOARD THAT HAD ALSO BEEN USED TO STOP THE FLOW OF WATER. THE BOARD WAS REMOVED FROM THE AREA. THEN THE BACKHOE MOVED FROM THE WEST SIDE BACK TO THE EAST SIDE TO REMOVE ADDITIONAL ROCKS FROM THE CROSSING. PHOTOGRAPHS WERE TAKEN DURING THE ORDEAL OF UNSTOPPING THE BOX CULVERT AND ARE INCLUDED WITH THIS REPORT. CLEANING OF THE BOX CULVERT BEGAN AT APPROXIMATELY 9:00 A.M. AND WAS COMPLETED AT APPROXIMATELY 12:00 NOON. THIS REPORT IS WRITTEN TO THE BEST OF MY RECOLLECTION. SIGNED, (~~ PHOTO I.D. SHEET NOVEMBER 8, 2001 2:30 P.M. BOX CULVERT INTENTIONALLY SEAGO ROAD CROSSING STOPPED UP HUNT, TEXAS 1.) STREET SIGN, SEAGO ROAD, WHERE INCIDENT TOOK PLACE 2.) EXIT S.H. 39 ONTO SEAGO ROAD, NOTE CROSSING ON LEFT 3.) SEAGO ROAD CROSSING OF GUADALUPE RIVER 4.) SHEET OF TIN REMOVED BY KERR COUNTY ROAD AND BRIDGE CREW. TIN WAS USED TO STOP FLOW OF WATER UNDERNEATH BRIDGE ON WEST SIDE (UPPER SIDE) OF CROSSING 5.) ANOTHER SHOT OF SHEET OF TIN FROM NORTH DIRECTION 6.) WEST SIDE OF CROSSING, MOUTH OF BOX CULVERT. ROCKS DISCOVERED STACKED UP IN MOUTH OF BOX CULVERT AFTER SHEET OF TIN REMOVED 7.) WEST SIDE OF CROSSING, MORE ROCKS 8.) NORTHEAST SHOT OF ROCKS STACKED IN BOX CULVERT 9.) IN REFERENCE TO PICTURE NUMBER 8 10.) KERR COUNTY ROAD AND BRIDGE CREW RODDING OUT BOX CULVERT WITH PIPE TO CLEAR CULVERT OF ROCKS 11.) WEST SIDE OF CULVERT, ROCKS PUNCHED OUT BY PIPE 12.) IN REFERENCE TO PICTURE NUMBER 11 13.) BACKHOE CONTINUES TO MOVE ROCKS FROM UNDER BOX CULVERT 14.) IN REFERENCE TO PICTURE NUMBER 13 15.) CHAIN ATTACHING PIPE TO BACKHOE BUCKET CAME LOOSE SEVERAL TIMES AND HAD TO BE REATTACHED 16.) ROCKS (WEST SIDE) PUNCHED OUT FROM LOWER SIDE (EAST SIDE) BEFORE MOVING BACKHOE TO WEST SIDE 17.) WEST SIDE OF BRIDGE, IN REFERENCE TO PICTURE NUMBER 16 18.) BACKHOE OPERATOR REMOVING ROCKS FROM MOUTH OF BOX CULVERT 19.) BACKHOE FINALLY HAS TO GET IN THE RIVER TO GET ALL OF THE ROCKS AWAY FROM THE MOUTH OF THE BOX CULVERT 20.) IN REFERENCE TO PICTURE NUMBER 19 21.) THIS BOARD WAS ALSO REMOVED FROM MOUTH OF BOX CULVERT 22.) CLEARING ROCKS FROM WEST SIDE OF ENCOUNTERS DEEP WATER AND UNEVEN, SLIPPERY RIVER BED 23.) ROCKS REMOVED FROM WEST SIDE OF BOX CULVERT AND PLACED ALONG RIVER BANK ON NORTH SIDE OF GUADALUPE RIVER, S.H. 39 SIDE 24.) THIS PILE OF ROCKS AND GRAVEL WAS REMOVED FROM THE EAST SIDE OF BOX CULVERT, THAT CAME OUT FROM UNDERNEATH BRIDGE WHILE PUNCHING WITH THE PIPE ,.. ~~nAtW ~~r'rn~'tur~~; i~[[>[; ~rn f~~nrt,Hne; rinrrr;'c rnMr; [,~~~,:;t~~ s~~,vF:F~A~, ~~r~es Ar•~o t~Ah °r~, ~sF; ~af•;A~r~rArufiD ++.. a+v' ~ ~~~~. '='_ _ < _~ -~l _ ~` i J »_ ~~~ _ x _~ ~ -~.. ~ '.~~ #- `n ~ i '~ !t~ ~- ~ g :~ ~ ` ~~ .. t ~zs+ya t. '~.~' - --.; _~s. `~,, ~'_M'S (WES'T' S[DE) PUP]~'fIP;I~ ~)U'1' Fh~~f~l L~~'',i I', I' .~!f~F, (F. I~'~. Jliil~ ~ f'~L;P~ ARE f°l~ ~V IN , RAC KHUL•'~ 'P~~ 71FST ~TDE r ',' r i' ~ ,u` ~,, , -- ,, .~ ._ _- w '^" - f--