ORDER NO. 31061 REVISED PROPOSAL FOR ENGINEERING SERVICES FROM L. WAYNE WELLS, P.E. Came to b~ heard this the 27th day of October, 2008, with a motion made by Commissioner Letz, seconded by Commissioners Oehler/Williams. The Court unanimausly~ approved by a vote of 4-0-0 to: Approve the; revised proposal for Engineering Services from L. Wayne Wells, P.E. (for an hourly rate and mileage increase, effective November 1, 2008 through November 1, 2010), and authorize County Judge to sign same. ~.ly 3-~bI COMMISSIONERS' COURT AGENDA REQUEST PLEASE FURNISH ONE ORGINAL AND TEN COPIES OF THIS REOUEST AND DOCUMENTS TO BE REVIEWED BY THE COURT. MADE BY: Leonard Odom, Jr. OFFICE: Road & Bridge MEETING DATE: October 27, 200$ T1ME PREFERRED: (D- 3c 'i4-+-~ SUBJECT: (PLEASE BE SPECIFIC) Consider, discuss and take aaurouriate action to aaprove the revised Arouosal for En~ineerin~ Services from L. Wayne Wells. P.E. EXECUTIVE SESSION REQUESTED: (PLEASE STATE REASON) NAME OF PERSON ADDRESSING THE COURT: Leonard Odom, Jr. ESTIMATED LENGTH OF PRESENTATION: 5 minutes IF PERSONNEL MATTER -NAME OF EMPLOYEE: Time for submitting this request for Court to assure that the matter is posted in accordance with Title 5, Chapter 551 and 552, government Code, is a follows: Meeting scheduled for Mondays: 5:00 P.M. previous Tuesday THIS REQUEST RECEIVED BY: THIS REQUEST RECEIVED ON: (a~ All Agenda Requests will be screened by the County Judge's Office to determine if adequate information has been prepazed for the Court's formal consideration and action at time of Court Meetings. Your cooperation will be appreciated and contribute. towards your request being addressed at the earliest opportunity. See Agenda Request Rule Adopted by Commissioners' Court. t,~ E ~ y~` ?~ Pin ~+Mfi Kerr County Road & Bridge 4010 San Antonio Hwy Kerrville, Texas 78028 TO: COMMISSIONER'S COURT FROM: LEONARD ODOM DATE: OCTOBER 27, 2008 RE: Accepting the Revised Proposal. For Engineering Services from L. Wayne Wells, P.E. L. Wayne Wells contracts Engineering Services for Kerr County Road and Bridge Department. Wayne Wells bills Kerr County Road and Bridge Department. Kerr County Road and Bridge Department then bills the Developer or Property owner. We have included a recent invoice for L. Wayne Wells's current rates. At this time Mr. Wells asks that you review and consider for approval the Revised Proposal which would go into effect November 1, 2008 and be effective through November 1, 2010. If you have questions, Wayne Wells is here to answer any questions. Th CC MEMO L. WAYNE WELLS.doc v - 1 f ~._.. TO: Len Odem, Kenr'County Subdivision m;n;etr~ror FROM: L. Wayne Wells, P.E. DATE: October 14, 2008 SUBJECT: Headwaters Ranch Subdivision, Phases I, II, and III, Engineering Services Invoice No. 4 Submitted herewith is the above referenced 'invoice, for my fees incurred on this subdivision through October 10, 2008. Professional: Includes coordination with Kerr County Road and Bridge and Contractor, site visits for construction progress and density testing of subgrade and base for Phase II; delivery of letter of recommendation to Engineer and Kerr Road. and Bridge on Phase I; and invoicing. 8.50 Hours @ $35.00 Per Hour = $297.50 Travel Tune: 11.00 Hours @ $20.00 Per Hour = $220.00 Mileage: 257.5 Miles @ $0.505 per Mile = 130.04 TOTAL. (This Invoice): $ 647.54 If you have any questions or require further information regarding this matter, please contact me. Sincerely, ~~. ~ f ,/ L. Wayne Wells, P.E. APPR01f ~~ tiCa.~ to • ~~-ors ts"-Goo - ~ES-~ REVISEI} PROPOSAL to I~:ERR COUl~TY COMMISSIONERS COURT for El~GINEEF~II~TO SERVICES from L. Wayne Wells, P.E. October 26, 2008 I am proposing to provide Engineering Services to Kerr County, in three Parts. Part A will include answering any questions regarding the Kerr County Subdivision Regulations, to meet with prospective developers, county property owner's, or members of Kerr County government and to answer their questions(usually they will be directed to the Ken County Subdivision Administrator). Additionally, I will perform any other assignment that the Commissioners Court, or its individual members, deems to have me perform, at our mutual agreement. Finally, I will provide reviews of future changes to Kerr County Subdivision Regulations, as requested by Commissioners Court, or their representative, at the saw rate as hereinafter stipulated by this Engineering Services Proposal. Part B will inchide review of Preliminary and Final Plats for compliance with the regulations, and review of Engnaeered Documents for Ken County, as set forth in the Kerr County Subdivision Regulations. Tl~se Engineering Services will include, as a minimum, the review of submitted documezi#s in accordance with the aforementioned Regulations in their current and amended forms. Documens will be reviewed for compliance with generally accepted engineering Practices and will not include a detailed engineering review; i.e. drainage requirements will be reviewed for providing the required items of the Regulations, but will not include an independent detailed calculation to verify provided calculations. Documents to be reviewed will inchide, as a minimum, the following: 1. Drainage requirements 2. Plan and profile drawings 3. Construction detail drawings including, but not limited to: a. Cross sections of roadways b. I?rainage structure details c. Guardrails and other safety features 4.'_ Sign layouts 5. Traffic studies or calculations to justify any traffic vohune requirements for proposed subdivisions. Part C will provide Construction Compliance Inspections. The inspections will be performed at the following stages of development: L On receipt of formal notice that subdivision of lands is proposed, a site inspection will be conducted to evah~ate the conceptual plans and validate preliminary determinations of road routing and classification. 2. When right of way has been cleared for grading, location and size of drainage structures wall be reviewed aril verified. Any special grading sections will be established at this time. 3. When grading is complete and subgrade is prepared for receipt of base material. Page 1 4. During placement of base material when the material being delivered will be sampled and tested for conformity with quality and grading requirements. 5. After base material has been completed and finished for the prime coat. 6. When prime coat is cured and before placement of the wearing surface. 7. Such other inspections as might be considered necessary for unforeseen conditions. 8. A final in-depth inspection of the completed work as a prerequisite for recommending acceptance of the work and release of the surety. 9. Interim maintenance and condition inspections during a period of one year following tentative acceptance of the work by the Commissioners Court. Interim maintenance activities shall include such items as drainage correction and refinement, spilled concrete, mud and debris on road, damage from previously unknown springs, pumping of pavement, unraveling of pavement, etc. Maintenance of drainage improvements shall inchide removing debris, re-grading eroded areas, re-sodding eroded areas and the installation of additional concrete riprap where designated by the Precinct Commissioner to permanently prevent erosion. 10. Periodic inspections, during the different phases of construction, to verify compliance with generally accepted and mandated methods of construction. I am proposing to provide Engineering Services to Gillespie County at the following rates: 1. Part A will be provided at the rate of sixty dollars ($60.00) per hour. My travel time will be billed out at the same rate, which does not inchide vehicle mileage. 2. Part B will be provided at the rate of one hundred dollars ($100.00) per hour. My travel time will be billed out at the same rate, which does not inchide vehicle mileage. 3. Part C will be provided at the rate of seventy dollars ($70.00) per hour. My travel time wdl be billed out at the same rate, which does not inchide vehicle mileage. 4. Mileage will be billed at the Standard Mileage Rate for Business Use of a Vehicle, as established by the Internal Revenue Service of the United States. Billings will be performed on a monthly basis and will be broken down by the respective subdivision for which work is performed. Additionally, billings will reflect whether the work is performed for an engineering review or for compliance inspections (if applicable). Payment shall be made m the month of billing submittal, provided the submittal is presented in adequate time for County personnel to review it for approval, prior to the first Commissioners Court meeting for said month. Your signature on this document provides acceptance of this proposal. This proposal will constitute a contract for Contract Labor for Kerr County and shall not be construed in any manner as to make me an employee of Kerr County. It will make me the authorized representative for Kerr County only in the aforementioned matters This contract maybe terminated by either party with two weeks written notice. Page 2 Finally, these rate changes will go into effect November 1, 2008, provided Commissioners Court approves them at their last meeting in October. These rates will remain in effect until November 1, 2010. Respectfully submitted, *•.~_ •NfNNNffNfNNf~ /J1 L ~Yt~ W~tl.4 ~~~ V ~ ~~N~~N~Mf N~~~~11~~ G2yIy~ ~ 9 f R 4~t14 < ~_'f~ G. ~ ~cE~~i L. Wayne Wells, P.E.. Acceptance: Date: ~,~~~--~7 ~~ Co ,Texas. Page 3